Operation
4.1

Device operation

After all adjustments have been made, the device (RF-H) is ready for use.
The device (RF-H) can be either pushed or pulled by an operator at the operating handle.
The operator stands to the right behind the kerb stone so as not to compact the fresh lean concrete bed (concrete
subgrade) by footprints.
To make work easier, e.g. in case of large material piling up, the device (RF-H) can be pulled along by a second
operator. For this a bucket is hooked into the towing plate.
The device (RF-H) may only be placed on the curb and used as shown.
Kerb stone
51000064