PREVENTIVE MAINTENANCE
PREVENTIVE MAINTENANCE
5. Every six months
A.
Lubricate connecting rod(s) upper bearing, with Barrierta L55/3 (Klüber).
6. Every 9 months or 1000 hours (whichever occurs first)
A.
Inspect and clean the valves (located between the cylinder's upper part and its head).
B.
Replace connecting rod(s) lower bearing.
C.
Replace rings on the piston (see note below).
D.
Inspect and clean the check valve
7. Yearly
A.
Have the pressure switch, pressure gauge and ASME safety valve, calibrated either by an official
institution or according to local Technical Norms. This operation must be carried a device not
couplet to the air tank.
Note:
1-
Items 5A, 6A/B/C and D must be carried out by the nearest Schulz Authorized -
Technical/Distributor.
2-
The above instructions are based on normal operation conditions. If the compressor is
installed in a polluted area, increase inspection intervals.
3-
Evaluate the air tank's filling up time. If it is 20% higher than what is specified in Table 1,
Technical Data, page 4, change ring(s).
4-
* See item 13, page 3, "Safety Instruction".
Cylinder head and fan
Place
lbf . in
(N . m)
TABLE 3 - BOLT TORQUE SPECIFICATIONS
IMPORTANT
!
Switch OFF the air compressor, remove the water and exhaust the air from the tank at the
end of every working day.
SERVICE
SERVICE
Please have the following information available for all service calls:
Model air compressor
Serial number
Dealer
Proof of purchase
CORRECTIVE MAINTENANCE
CORRECTIVE MAINTENANCE
To assure product safety and reliability, repairs, maitenance and adjustment should be performed
by Schulz Authorized - Technical/Distributor
* 6
.
Cylinder to crankcase
(1/4" HEX.)
83.0
(9.3)
Date
always
(5/16" HEX.)
153.0
(17.0)
using identical replacement original parts.
Crankcase cover
(1/4" CRACK)
53.0
(6.0)
13