Operating Instructions; Parts List - Create DRYZONE Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 9
Before using the appliance, remove all of the packaging materials.
1. Connect the DC power jack (12) to the DC power socket (14) and then connect the AC plug
(11) to the wall outlet.
2. Turn the appliance on using the "On/Off" switch and the green LED light will come on. As
soon as the dehumidifier starts working you should be able to feel the air blowing from
the dry air outlet (5).
3. To turn the appliance off, just press the "On/Off" switch (6).
1
2
3
4
10
1. "On" green indicator light
2. "Full tank" yellow indicator light
3. Air inlet
4. Removable water tank
5. Dry air outlet

OPERATING INSTRUCTIONS

PARTS LIST

5
7
6
8
11
12
6. On/Off switch
7. Water outlet hole
8. Water tank
9. Float switch
10. Rubber foot
9
13
14
11. AC plug with power cord
12. DC power jack
13. AC/DC charger
14. DC Power socket
ENGLISH
7

Publicidad

Tabla de contenido
loading

Tabla de contenido