How To Prepare The Motor - Cherubini Blue Wave Rx Serie Instrucciones

Programación desde el pulsador
Ocultar thumbs Ver también para BLUE WAVE RX Serie:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

STOP RING NUT
1
2
3
NB: If you use tubes with a round form, the driving pulley must be fixed to the tube, and
the installation is to be paid by the person who installs the system. For other tube sections
the fitting is optional, but strongly recommended.

HOW TO PREPARE THE MOTOR

STOP RING NUT ADAPTOR
DRIVING PULLEY
1. Insert the adaptor in the stop ring nut
mating the groove with the reference notch
and push till they touch.
2. Fix the driving pulley on the motor pin
until the stop pin clicks.
3. Insert the motor fully in the rolling tube.
21
I
Tabla de contenido
loading

Este manual también es adecuado para:

Blue 35 wave rxBlue 45 wave rxBlue 58 wave rx

Tabla de contenido