Final Tasks - Toshiba ССD Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 74
Indoor unit cassette type
12.

FINAL TASKS

1. Check all valve caps and ensure that they had been tightened properly. Close the valve
cover.
2. Fill gaps on the wall between hole sides and tubing with sealer.
3. Attach wiring and tubing to the wall with clamps where necessary.
4. Operate the unit for no less than 5 minutes at heating or cooling mode.
5. Explain filter removal, cleaning and installation.
6. Operate the air conditioner together with the customer and explain all functions.
7. Give the operating and installation manuals to the customer.
22

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

KcdDccCdm

Tabla de contenido