ASSEMBLE
STEP 8 - CABLE OF THE TOWER ADJUSTMENT
19
NAME
Cable tensioner
20
NAME
Low Profile hex nut
M8
E
NAME
Steel Cable
M
NAME
Load multiplier
N
NAME
Steel cable
THE RIGHT POSITION TO ASSEMBLE
THE CABLE TENSIONER (19), IS
INDICATED BY THE FRIEZE WHICH IS IN
ITS EXTREMITY! (FRIEZE DOWN).
QTY
1x
QTY
1x
FRIEZE
20
19
Figure 8-1
M
20
19
M
Figure 8-3
E
N
Figure 8-5
N
24
Figure 8-2
Figure 8-4
N
M
Figure 8-6
X cm
The same distance of
the cables in
the tensioner and
the load
multiplier, the
cable should
be put
at the same time
X cm
N