Pack Contents; Installation; Connection To Electricity - ccei RNS-1 Instrucciones De Uso

Ocultar thumbs Ver también para RNS-1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 41
OPERATING INS-
TRUCTIONS

2. Pack contents

1 module RNS-1, RNS-2 and NIVA 3 Module
1 24V solenoid
1 level sensor (different depending on the model)

3. Installation

3.1. Connection to electricity

Installation of this project involves a hazard of electric shocks. We strongly
recommend you contract a professional installer. Incorrect installation places
you in danger and may irreversibly damage the product and the equipment
connected to it.
For safety reasons and in compliance with the NF C15-100 standard, the box in
which the RNS-1, RNS-2 and NIVA 3 Module is installed must be
• either at 3.50 m from the pool edge. This distance takes into account the dis-
tance around obstacles. If the RNS-1, RNS-2 and NIVA 3 Module control
box is installed behind a wall, the distance will include the length of the path
taken to move around the wall to reach the box.
• or in an in-ground space immediately next to the swimming pool. In this case
the space must be accessible via a hatch which requires a tool to open it.
• downstream of a high sensitivity ground fault protection (30mA) in com-
pliance with the NF C15-100 standard
RNS-1, RNS-2 and NIVA 3 Module
1 screen filter (max pressure 4 bars)
1 Technical manual (this document)
v1.0EN
3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rns-2Niva 3Pf10l006Pf10l002Pf10l009

Tabla de contenido