Preparing For Piling The Stones - Helo Rocher 70 Pure Instalación Y Manual De Uso

Calentador de sauna eléctrico:
Ocultar thumbs Ver también para Rocher 70 Pure:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 83
8
Installations- und Benutzerhandbuch Rocher Pure

2.11. Preparing for piling the stones

Removing of the supporting bars to pile the stones
Unscrew the bars' mounting screws (2 pcs).
Lift the support bar's locking plate up from its
normal position.
Lift off the support bars.
Pile stones up to the Helo marker.
Reinstall the support bars.
Install the support bars as above in the reversed order.
Pile the stones so that they cover the heating elements.
For specific instructions refer to section 2.5 Sauna heater stones.
Abbildung 3 Preparing for piling the stones
Tabla de contenido
loading

Este manual también es adecuado para:

Rocher 105 pure1102-70-040511 1102-105-040511

Tabla de contenido