Descargar Imprimir esta página
Eaton Metalux Skybar Instrucciones De Montaje
Eaton Metalux Skybar Instrucciones De Montaje

Eaton Metalux Skybar Instrucciones De Montaje

Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

IB519005EN
Installation Instructions – Skybar Single Sensor Mounting
Instructions
Instructions d'installation – Instructions de montage du capteur
unique Skybar
Instrucciones de instalación: Instrucciones de montaje para el sensor
individual Skybar
WARNING
Risk of fire, electrical shock, cuts and or other casualty
hazards. This product must be installed in accordance
with the applicable installation code by a qualified
electrician or a person familiar with the construction
and operation of the product and the hazards involved.
Eaton assumes no responsibility for claims brought
about by improper or careless installation or handling
of this product.
WARNING
Risk of Fire and Electric Shock. If not qualified, consult
an electrician.
IMPORTANT: Read carefully before installing fixture. Retain for future reference.
ATTENTION Receiving Department: Note actual fixture description of any shortage or noticeable damage on delivery
receipt. File claim for common carrier (LTL) directly with carrier. Claims for concealed damage must be filed within 15
days of delivery. All damaged material, complete with original packing must be retained.
INSTALLATION
Skybar End Row Sensor Mounting Instructions
1.
Remove the two screws attaching the metal end plate
as shown (Figure1). Discard the end plate but retain the
screws for use later.
2.
Connect all wiring to sensor as shown on the sensor
instruction sheet supplied separately.
CAUTION
Edges May Cut. Handle with care.
CAUTION
Risk of burn. Disconnect power and allow fixture to cool
before changing bulb or handling fixture.
NOTICE: Green ground screw provided in proper location.
Do not relocate.
NOTICE: Minimum 90° supply conductors.
NOTE: Specifications and dimensions subject to change
without notice.
Figure 1.
Brand Logo
reversed out of
black
INS #
INS #
loading

Resumen de contenidos para Eaton Metalux Skybar

  • Página 5: Instalación

    Riesgo de quemadura. Desconecte la alimentación y deje que el soporte se enfríe antes de cambiar la bombilla o manipular el instalación aplicable. Eaton no se responsabiliza por los reclamos presentados respecto de la instalación soporte.
  • Página 6 Instale los dos tornillos adicionales incluidos con el alojamiento desde la parte superior del canal y hacia el interior de las pestañas para asegurar mejor la pestaña en los grabados de alineación (Figura 5). Figura 5. Figura 3. Figura 6. EATON IB519005EN Instrucciones de instalación...
  • Página 8 Warranties and Limitation of Liability Please refer to www.eaton.com/LightingWarrantyTerms for our terms and conditions. Garanties et limitation de responsabilité Veuillez consulter le site www.eaton.com/LightingWarrantyTerms pour obtenir les conditions générales. Garantías y Limitación de Responsabilidad Visite www.eaton.com/LightingWarrantyTerms para conocer nuestros términos y condiciones.