For correct assembly, it may be necessary to use a mallet and clamp to remedy light slat deformations
caused by storage. Do not strike the wooden slats directly, use the protective martyr blocks (sections of
slat approximately 30 cm long, supplied.
The heads of screws inserted from the inside of the pool should be flush with the pool wall to avoid
damaging the liner.
The height under the coping of the assembled pool will only be 1.303 m if the moisture content of the
wood is normal and the slats are properly fitted together.
Once the slats have been assembled, paint the ends of the slats (in each of the 4 corners and at the
junction between the pool and the plant housing/ storage box). This will help limit deformation over time.
This product is white on application, but becomes colourless when dry. Drying time is 2 to 3 hours. If the
temperature is high or the drying time is too fast, apply a second coat. Follow the safety instructions on the
container. Rinse the brush with water after use.
IMPORTANT
The structural dimensions and measurements listed have a tolerance of +/- 3% (European standard
EN 16582-1). The AFNOR AC P90-321 agreement allows the following deviation in terms of depth:
•
For a depth less than or equal to 1.25 m: +/- 3 cm.
•
For a depth greater than 1.25 m and less than or equal to 1.65 m: +/- 5 cm.
•
For a depth greater than 1.65 m: +/- 8 cm.
20/48
2021/02 - Version: D Code : 37311
Figure 10 – Screwing the slats together
WOODEN POOLS
BWT myPOOL POOL'N BOX