Installaton - Klarstein FIJI FLOW SMART Manual Del Usuario

Ventilador de techo
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

EN
22

INSTALLATON

Installation prepraton
To prevent personal injury and
damage, ensure that the hanging
location allows the blades a
clearance of 2.3m from the
floor and 76cm from any wall or
obstruction.
Be sure the outlet box is securely
attached to the building structure
and can support the full weight of
the fan.
Preparing the Fan Site
Downrod Installation
This fan can be mounted with a downdrod on a normal or vaulted ceiling.
The hanging length can be extended by a longer downdrod.
Installation requires these tools: Screwdriver, flat-head screwdriver, adjustable
pliers or wrench, stepladder, wire cutters, and rated electrical tape.
Standard Mounting hangs from the
ceiling by a downrod
76 cm
from wall
or nearest
obstructions
support brace
Angled Mounting recommended for
a vaulted or angled ceiling.
2.3 m
blades to floor
20°
support brace

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

1004609110046092

Tabla de contenido