Samsung RF28K9380SR Manual Del Usuario página 49

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Provision for Open Access to the Connected Product Requirements
1. SGIP Open Standards (Smart Energy Profile 2.0 - http://www.csep.org/)
- Energy Consumption Reporting
- Demand Response
2. Samsung OPEN API
- Operational Status, User Settings & Messages
- ICE Maker Status: GET /external/icestatus?icegetstatus=opt (relevant to the energy
consumption of the product 1)
- Door Open Alarm: GET /devices/0/Door?type=opt (relevant to the energy
consumption of the product 2)
- DR Status: GET /external/drlc?drgetstatus=opt
- Delay Defrost Capability
- Set Schedule of the Defrost Delay: POST /devices/0/defrost/addSchedule
- Get Schedule of the Defrost Delay : GET /devices/0/defrost/getSchedule
- Delete Schedule of the Defrost Delay: POST /devices/0/defrost/delSchedule
- Defrost Delay On/OFF: PUT /devices/0/defrost/delayevent
Untitled-2 49
English 49
2018-07-05
5:53:18
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Rf28k9380sr/aaRf28k9070

Tabla de contenido