Preparation For Operation - hillvert HT-IRI-01 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 45
1 - Test spindle
2 - Rainfall adjustment cap
3 - Universal mounting bracket
4 - Sensor cord

3.2. Preparation for operation

POSITIONING OF THE UNIT
The device should be installed within an open space. Access to natural
environmental conditions should be provided: to sunlight and rainfall. Protect the
sensor against sprays and water flowing from the roof of the building. It is
recommended to place the device on drainpipes or on the edge of the roof.
ASSEMBLY OF THE UNIT
The sensor should me mounted as close to the controller as possible. Place the
device's mounting bracket at the edge of installation (2) and tighten it with the
screw (1).

Publicidad

Tabla de contenido
loading

Tabla de contenido