FLEXIBLE DELINEATOR
POST WITH BASE
1. Clean and dry pavement surfaces prior to
installation. Surfaces should be blown clean at a
minimum of 90 psi.
NOTE: Minimum installation temperature for
pavement is 70°F and 40°F for air. If pavement
is less than 70°F, the surface must be warmed
with a torch or heat lance.
2. Remove clear liner from top of H-4467 Butyl Pad.
Place exposed side of butyl pad onto the pavement
and apply pressure.
3. Remove the white release liner to expose the upper
adhesive surface.
NOTE: If pavement is less than 70°F, the top
surface of the butyl pad must be lightly
warmed with a torch or heat lance for
approximately 2-5 seconds.
4. Immediately place the black plastic base in the
center of the butyl pad. Flow arrows should align with
the direction of traffic. Apply pressure. (See Figure 1)
Figure 1
PAGE 1 OF 3
1-800-295-5510
uline.com
INSTALLATION
5. Align the hole in the post with the middle hole in the
base and insert the post. (See Figure 2)
Figure 2
6. Using a hammer or rubber mallet, insert plastic pin
into the center hole to secure the post to the base.
(See Figure 3)
Figure 3
7. Allow up to two hours for butyl pad to fully adhere.
Para Español, vea página 2.
Pour le français, consulter la page 3.
0821 IH-4465
loading

Resumen de contenidos para Uline H-4465

  • Página 2 H-4465, H-4466, H-4467 800-295-5510 H-7959, H-7960, H-7961 uline.mx POSTE DELIMITADOR FLEXIBLE CON BASE INSTALACIÓN Limpie y seque las superficies pavimentadas antes 5. Alinee el orificio en el poste con el orificio de en de instalarlo. Se debe usar una sopladora de por lo medio de la base e inserte el poste.

Este manual también es adecuado para:

H-4466H-4467H-7959H-7960H-7961