Step 5-Completing The Installation - Quipon Grh085Da-K3Na2B Manual De Usuario

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

STEP 5-COMPLETING THE INSTALLATION

To complete the installation and system checkout requirements, the following steps must be performed.
1. Check the thermostat position. Make sure the thermostat is routed through the holding guide and is not
touching any metal surface.
2. Secure the ceiling grille to the ceiling assembly wind-path with 4 screws. (see Figure 10).
Install the healthy filter and air intake grill. Press "PUSH" and lock with clasps.
3.
Switch on the power supply and check the unit work or not.
4.
4 screw
wind path
front panel
front grill
filter
- 54 -
Tabla de contenido
loading

Tabla de contenido