Step 1: Put the CV boots on the front jaws(1) as show FIG 1 And ensure the jaws
hold CV boots firmly.
Step 2: Press the pressure switch (2), then the front jaws will open to max diameter
110mm. see FIG2
Step 3:Put the CV boots into the CV joint as FIG 3, then press the release bottom
to release the CV booth onto the CV joint. See FIG4 and FIG5.
Technical details
CV joint diameter:25-110mm
Weight:3.25kgs
Working pressure:5-8 bar(72-113 psi or 5-8kg/m
Max. air pressure : 9 bar (125psi or 9 kg/m
Air inlet size:1/4"BSP
Warning : Don't open when the boots didn't put on the jaws.
Wear eye protector before using.
Jaws
FIG 1
Safety value
FIG 2
)
2
)
2
Pressure bottom
Release bottom
FIG 3
Air inlet
FIG 4
FIG 5
Tabla de contenido
loading

Resumen de contenidos para King Tony QM1125

  • Página 4: Herramienta Neumática Para Instalación De Funda De Palier

    Herramienta Neumática para Instalación de Funda de Palier Instrucciones de Uso Paso 1: Colocar las mordazas de la herramienta en la funda de palier nueva (figura 1), y asegurar que estén sujetadas de manera firme. Paso 2: Oprima el botón de funcionamiento (figura 2) y las mordazas se abrirán hasta un diámetro máximo de 110mm expandiendo la funda.

Tabla de contenido